top of page
IMG_5780.JPG

The Full Story

Location: Langney Shopping Centre

Works: 

The contract consisted of:

• 34m of new heavy duty ACO drainage.
• 40m of new surface water below ground drainage.
• 3000L 3 stage Separator installation
• 2 x precast concrete catch pits.
• 4m deep main sewer connection.

Some of our shots

bottom of page